Esta página también está disponible en español. Ver en español
Apartment with corner window — Calle Diego de León, 54
← All Lumier homes

Apartment with corner window

Calle Diego de León, 54

Surface
227 m²
Bedrooms
3
Bathrooms
4
Floor
Price
€2,850,000
Nine parking spaces for residents’ use

Lumier presents this 227 m² home on a fully exterior fifth floor, right on Calle Diego de León, in the heart of the Barrio de Salamanca. Completely renovated by Mónica Diago's prestigious architecture and interior design studio, it is an exercise in luxury restoration where every material and detail has been chosen with an author's eye.

Light is the protagonist: a large corner window with open views fills the living area with light from morning to late afternoon. The living-dining room opens around a fireplace and connects to the kitchen through elegant marble openings and wood-and-glass doors, creating a spacious, fluid and luminous daytime area.

The kitchen, with bespoke cabinetry and an island, combines noble woods and natural stone worktops, integrating into the whole without sacrificing functionality. The home also features two balconies that extend the rooms outdoors.

The private quarters offer three double bedrooms, each with an en-suite bathroom and built-in wardrobes. A guest toilet completes the layout, so no one ever has to share a bathroom.

The level of finishes is the studio's signature: herringbone wood floors, selected marbles and noble woods, bespoke carpentry and cabinetry, restored mouldings and cornices, and lighting considered room by room. The building also has nine parking spaces for residents’ use.

Diego de León is one of the most established residential streets in the Barrio de Salamanca, with local shops, restaurants and immediate connections to Príncipe de Vergara and Francisco Silvela. Space, light and standing in one of the best addresses in central Madrid.

Floor plan

Floor plan — Apartment with corner window
Property dossier — Apartment with corner window
For sharing

Property dossier

Everything about this home in a single lightweight PDF: photos, floor plan, surfaces and details. Ready to download or forward via WhatsApp.

Location

Apartment with corner window · €2,850,000

Book a viewing

Did you know our homes sell within days?

[email protected]